冷卻塔安裝要求

1.冷卻塔安裝要求

1. Installation requirements of cooling tower
(1)冷卻塔的安裝應(yīng)根據(jù)設(shè)備的各種條件,考慮其安裝位置的地面及其荷載能力,同時(shí)也考慮外界條件。
(1) The installation of the cooling tower shall consider the ground and its load capacity at the installation location as well as the external conditions according to various equipment conditions.
(2)安裝時(shí)應(yīng)注意冷卻塔的基礎(chǔ)按規(guī)定的尺寸預(yù)埋好水平鋼板,各基礎(chǔ)點(diǎn)的標(biāo)高應(yīng)在同一標(biāo)高的水平面上。
(2) During installation, it shall be noted that the horizontal steel plate shall be embedded in the foundation of the cooling tower according to the specified size, and the elevation of each foundation point shall be on the horizontal plane of the same elevation.
(3)塔體應(yīng)放置水平。水塔在施工安裝時(shí),為防止壓壞底盤(pán),施工人員應(yīng)踏在底盤(pán)的加強(qiáng)筋上,在安裝塔外殼、底盤(pán)等纖維件時(shí),為防止外殼底盤(pán)等變形可先穿螺釘,而后依次逐漸緊固,在確認(rèn)底盤(pán)不變形,附近干凈、干燥的條件下,為避免使用時(shí)漏水可在接觸處鋪設(shè)纖維氈及涂樹(shù)脂。
(3) The tower body shall be placed horizontally. During the construction and installation of the water tower, in order to prevent crushing the chassis, the construction personnel should step on the reinforcing ribs of the chassis. When installing the tower shell, chassis and other fiber parts, in order to prevent the deformation of the shell and chassis, the screws can be threaded first, and then the screws can be tightened gradually. After confirming that the chassis is not deformed, and the surrounding area is clean and dry, the fiber felt and resin can be laid at the contact point to avoid water leakage during use.
2.冷卻塔本體安裝
2. Installation of cooling tower body
冷卻塔不得安裝在通風(fēng)不良和出現(xiàn)濕空氣回流的場(chǎng)合,須安裝在通風(fēng)良好的場(chǎng)所。否則將會(huì)降低冷卻塔的冷卻能力。冷卻塔一般安裝在冷凍站的屋頂上,以形成高壓頭,用以克服冷凝器的阻力損失。水泵將需要處理的冷卻水從水池抽出送至冷卻塔,經(jīng)冷卻降溫后從塔底集水盤(pán)向下自流壓入冷凝器中,并繼而靠水頭壓差自流入水池,如此循環(huán)。
The cooling tower shall not be installed in the place with poor ventilation and wet air return, but in the place with good ventilation. Otherwise, the cooling capacity of the cooling tower will be reduced. The cooling tower is generally installed on the roof of the refrigeration station to form a high-pressure head to overcome the resistance loss of the condenser. The water pump pumps the cooling water to be treated from the pool to the cooling tower. After cooling, it flows down from the water collecting tray at the bottom of the tower to the condenser automatically, and then flows into the pool automatically by the head pressure difference, so as to circulate.
安裝時(shí),應(yīng)根據(jù)施工圖指明的坐標(biāo)位置就位,并應(yīng)找平找正,設(shè)備要穩(wěn)定牢固,冷卻塔的出水管口及噴嘴方向、位置應(yīng)正確。
During installation, it shall be in place according to the coordinate position indicated in the construction drawing, and shall be leveled and aligned. The equipment shall be stable and firm, and the direction and position of the water outlet and nozzle of the cooling tower shall be correct.

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
婷婷国产欧美四房五月天 | 91丨人妻丨国产熟妇| 大香蕉最新视频更新在线| 日韩免费又粗又长| 今晚福利av| 亚洲Aa中文字幕| 99一级在线| 婷色一区二区| 三级黄色免费无毒| 91国产人妻手机在线看电影| 日本黄色不卡在线| 午夜福利片网址| 久99久在线观看 一区| 中文视频亚洲三区| 欧美日韩亚洲一区图片| 国产插操日| 亚洲欧美51| 亚洲日本色鬼影院| 久久久懂色| 欧美精品d级一区二区三区| 深夜福利久久久久久| 日本高清视频久久日| 无码 一区二区| 欧美日韩国产乱0| 伊人久久国产综合网| 无码精品一区二区在线看| 日b高清视频在线观看| 国产亚洲精品成人a v久久麻豆| www.臊逼| 日B视频韩国| 国产精品 亚洲精品日韩已满| 欧美日本黄频| 日肥逼视频| 自拍 偷拍 欧美 一区| 无码一区 在线播放| 日本免费播放一区二区三区视频| 中国老年夫妻性生活一二三区视频 | 美女操逼操出白浆| www.国产精品一区在线| 国产精品亚洲一区二区欧美激情| 不卡一二三区首页|